Estimate Generator
Share ballpark pricing with contingency for early scopes.
About this tool
Give a client a ballpark price before the scope is fixed. Enter a low and high quantity or price for each line, add contingency, and the PDF headlines the range. It states clearly that it is an estimate, not a fixed price.
How to use
How it works
Each line gives a low and a high amount. Contingency is a percentage added to both the low and the high totals. If you add a tax line, it is applied to the midpoint of the range. An estimate is a range because the scope is not final, so the assumptions and exclusions you write down matter as much as the numbers.
low = Σ low lines × (1 + contingency) high = Σ high lines × (1 + contingency)
Worked example
A job with labour and materials
- Input
- Labour 40 to 60 h at 75; materials 1,200 to 1,800; contingency 10%
- Output
- Range 4,620 to 6,930
- Walkthrough
- Low: 40 × 75 + 1,200 = 4,200. High: 60 × 75 + 1,800 = 6,300. Add 10%: 4,200 × 1.10 = 4,620 and 6,300 × 1.10 = 6,930.
Limitations
- Not a fixed price or a commitment.
- Tax, if added, is calculated on the midpoint of the range.
Questions
Is an estimate a fixed price?
What does contingency do?
What is the difference between an estimate and a quote?
Can I put assumptions and exclusions on it?
Features
- Price range
- Labour, materials and other categories
- Contingency %
- Assumptions and exclusions
- Revision number
Related resources
Guides and videos from around the web—opens on YouTube or the publisher’s site.
Introduction to interest
Khan Academy
Money-time basics for quotes and payment schedules.
Watch on YouTubeFinding a percentage
Khan Academy
Tax and discount percentages on invoices.
Watch on YouTube
- Manage your finances
U.S. Small Business Administration
Official SMB finance basics next to invoice and rate tools.
- Percentages
Math is Fun
Tax and discount percent math on quotes.